宁夏30万方/天液化天然气装置开车运行

2016-06-20 12:20:00
becryo
原创
477
摘要:宁夏30万方/天LNG工程项目于2016年5月9日正式投产,生成出合格的低温LNG产品,温度到达-162℃,目前正常对外销售。 Ningxia 300,000-sq-d LNG project was officially put into operation on May 9, 2016, producing qualified low-temperature LNG products with a temperature of -162 ° C, which are currently sold normally.

宁夏30万方/天LNG工程项目于2016年5月9日正式投产,生成出合格的低温LNG产品,温度到达-162℃,目前正常对外销售。

Ningxia 300,000-sq-d LNG project was officially put into operation on May 9, 2016, producing qualified low-temperature LNG products with a temperature of -162 ° C, which are currently sold normally.

联系我们
联系人: 范博士 Dr. FAN
电话: 15858134686
传真: 0571-28285266
Email: contact@bcryo.com
QQ: 200899713
Skype: 15858134686
微信: 15858134686
微博: chinalng
网址: www.bcryo.com
地址: 浙江省杭州市滨江区丹枫路788号海越大厦2701室, 邮编:310051